Project Objective

2015

Increasing the sustainability and reliability of the natural gas transmission system.

Results Achieved / Expected Outputs

Expected Outputs

  1. 01 Installation and operation of a modular data centre collecting data from delivery points, compressor stations and pipeline valves in the gas network
  2. 02 Purchase and installation of new data centre security products to be added to the SCADA system
  3. 03 Installation of steady-state network simulation software with GIS data import and network optimisation capability
  4. 04 Purchase of real-time network simulation software allowing online and offline operation
  5. 05 Purchase of demand forecasting software compatible with the SCADA system for simultaneous data collection
  6. 06 Purchase of remote terminal units (RTUs) and spares
  7. 07 Increased sustainability and reliability of the natural gas transmission system