Project Profile · IPA II · Environment and Climate Action
Bandırma Integrated Water Project
Priority Area
Water (Infrastructure Activities) / Environment and Climate Action
Beneficiary
Balıkesir Metropolitan Municipality – Balıkesir Water and Sewerage Administration (BASKİ)
Other Beneficiaries
—
Duration
Wastewater treatment plant: 27 months · August 2021 – November 2023 · Drinking water supply and wastewater collection network: 24 months · June 2020 – June 2022
EU Contribution
€24,345,000
Location
Bandırma (Balıkesir)
Project Objective
IPA II
Construction of a wastewater treatment plant, drinking water supply and a wastewater network.
Improving the water quality of the Sea of Marmara and contributing to public health by reducing the pollution load of the wastewater currently discharged.
Resolving operational problems in the sewerage system through the new wastewater network, and reducing losses in the existing water distribution network through water reservoirs and transmission lines.
Results Achieved / Expected Outputs
Expected Outputs
- 01 Construction of drinking water supply and wastewater collection networks.
- 02 The new wastewater treatment plant will meet the area’s wastewater treatment needs until 2047.
Project profile · IPA II · Environment and Climate Action
All Environment and Climate Action Projects (IPA II)