Duration
Wastewater treatment plant: 27 months · December 2021 – March 2024 · Wastewater collection network: 24 months · December 2021 – December 2023
EU Contribution
€22,285,000
Location
Giresun
Project Objective
IPA II
Construction of a wastewater treatment plant and wastewater network.
Improving the water quality of the Black Sea and contributing to public health by reducing the pollution load of the wastewater currently discharged.
Resolving operational problems in the sewerage system through the new wastewater network.
Results Achieved / Expected Outputs
Expected Outputs
- 01 Wastewater treatment plant and wastewater network.
- 02 The new wastewater treatment plant will meet the area’s wastewater treatment needs until 2047.