Türkçe

Project Objective

IPA II

Construction of new wastewater collector lines and their connection to the existing wastewater treatment plant.

Contributing to public health by reducing the pollution load in the Kızılırmak River.

Results Achieved / Expected Outputs

Expected Outputs

  1. 01 The wastewater collector lines to be built along the right and left banks of the Kızılırmak River in Sivas will meet the area’s wastewater treatment infrastructure needs until 2047.

Project profile · IPA II · Environment and Climate Action

All Environment and Climate Action Projects (IPA II)